The paddle blanks glued and starting to shape up in sitka spruce with decorative mahogany 'stripes'.Setting out the sails
Sabtu, 18 Juli 2009
The paddle blanks glued and starting to shape up in sitka spruce with decorative mahogany 'stripes'.
Diposting oleh
arry
di
14.20
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Seats & Brass Stem
Minggu, 31 Mei 2009
Shaping and positioning the seats. These have a number of alternative positions forward and aft and also need to fit in with the position of the steering foot pedals, (plenty of measuring and trying out, before we finally commit ourselves!)

Read More..

Diposting oleh
arry
di
12.13
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Deck Beams, Carlins & Spars
Minggu, 10 Mei 2009
Deck Beams and Carlins complete, watertight (or will be) box surrounding mast step.

And now for some spar making, in best quality Sitka Spruce (and most of it ends up as shavings).

Fitting the sheeve blocks in the top of both masts.
Read More..

And now for some spar making, in best quality Sitka Spruce (and most of it ends up as shavings).

Fitting the sheeve blocks in the top of both masts.
Diposting oleh
arry
di
12.21
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Rudder & Transport Problems!
Minggu, 19 April 2009
Dress rehearsals
If we can work out a way whereby one person can get this 15�8� canoe onto the car top, won�t this be better than bothering with a trailer. Also an excuse to see the project in some daylight.
There you go � straightforward. Now off on-line to purchase a roof roller and canoe trolley.
Read More..
If we can work out a way whereby one person can get this 15�8� canoe onto the car top, won�t this be better than bothering with a trailer. Also an excuse to see the project in some daylight.
There you go � straightforward. Now off on-line to purchase a roof roller and canoe trolley.
Diposting oleh
arry
di
12.48
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Floors & Knees
Selasa, 07 April 2009
Floors and knees now in place. As the weight increases with each component, thoughts of car top transport are now being replaced by trailer designs. Not part of the original plan!

A watertight boxing is formed around the mast positions in the forward and aft deck. Copper tube is then set in place to drain any water which will come through the mast holes and take it back into the cockpit. Hopefully this leaves us with watertight bouyancy (and storage) areas forward and aft.

Read More..

A watertight boxing is formed around the mast positions in the forward and aft deck. Copper tube is then set in place to drain any water which will come through the mast holes and take it back into the cockpit. Hopefully this leaves us with watertight bouyancy (and storage) areas forward and aft.

Diposting oleh
arry
di
14.51
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Cockpit Coaming
Minggu, 15 Maret 2009
Two 3.5mm Ash boards are laminated around the curved carlin to start to form the cockpit coaming. A third plank will be added (and a top lipping) once the deck is in place. Four knees support the carlin each side. The whole structure quickly starts to gain further strength.

Read More..

Diposting oleh
arry
di
12.53
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Bulkheads
Senin, 02 Maret 2009
Diposting oleh
arry
di
13.38
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Langganan:
Postingan (Atom)


















