Completion

Minggu, 06 Desember 2009

Sails Up! An almost invisible repair complete, so back in business for some winter sailing on a very flooded welsh lake. Passes inspection from wife -...
Read More..

Launch Day

Sabtu, 17 Oktober 2009

Launch day finally arrives Weather and launch went perfectly, the sails for the Gunter rig set the Iain Oughtred designed MacGegor canoe off perfectly....
Read More..

Sails Up

...
Read More..

A boat trailer for Swift

Minggu, 13 September 2009

Checking the masts still fit Introducing the 'lightweight' trailer. Two thirds of the way through the build I finally accepted the canoe was not going...
Read More..

Paint & Varnish

Minggu, 06 September 2009

Work continues to shape the cockpit coaming (laminated in Ash) The first coat of varnish on the deck (the hull is protected from splashes by a curtain...
Read More..

Deck & Lee Board

Minggu, 16 Agustus 2009

The hull is primed Time to cook up some lead to cast into the lee boardMasts, spars and paddle are hung from the ceiling for their first coat of varnishGlueing...
Read More..

Setting out the sails

Sabtu, 18 Juli 2009

The paddle blanks glued and starting to shape up in sitka spruce with decorative mahogany 'stripes'.Fitting the folding rudder The floorboards are now...
Read More..

Seats & Brass Stem

Minggu, 31 Mei 2009

Shaping and positioning the seats. These have a number of alternative positions forward and aft and also need to fit in with the position of the steering...
Read More..

Deck Beams, Carlins & Spars

Minggu, 10 Mei 2009

Deck Beams and Carlins complete, watertight (or will be) box surrounding mast step.And now for some spar making, in best quality Sitka Spruce (and most...
Read More..